EDWARDSVILLE – An improvement project is scheduled to begin Monday, March 17, on Troy Road between Franklin Avenue and Fifth Avenue. As part of the work, this section will be resurfaced, some existing gaps in sidewalk infrastructure will be filled, and two crosswalks will be added -- one signalized and another with a flashing beacon -- to increase visibility for pedestrians and cyclists.

Drivers are asked to remain alert for workers as well as lane shifts that will be necessary while the road’s three lanes are milled and resurfaced. Slowdowns are to be expected; drivers may want to consider alternate routes. Barring unforeseen or weather-related delays, the work is expected to wrap up in about 12 weeks.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Article continues after sponsor message

Among planned improvements are the addition of a signalized crosswalk at the intersection of Troy Road and Montclaire Avenue. Sidewalks also will be added along portions of the west side of Troy Road. A crosswalk with a flashing beacon to alert drivers to pedestrians and cyclists will be installed on Troy Road near First Avenue. The City hired Stutz Excavating of Alton as the project contractor. The estimated $830,000 project will utilize $549,000 in federal Surface Transportation Program grant funds. The City’s portion will come from Capital Improvement Program funds and is expected to cost $281,000.

The project covers about 0.33 of a mile and is a continuation of Troy Road improvements in Edwardsville. Previous Troy Road resurfacing work was done in collaboration with the Illinois Department of Transportation. The City appreciates the cooperation and patience of all those impacted by the construction.

Prefer RiverBender on Google
Keep the Riverbend connected. Local news gives neighbors something to share, celebrate, and talk about. Your subscription helps keep those connections growing.
Support Local Journalism
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

More like this:

Edwardsville Accepts $21M Grant For Goshen Road/Lincoln Trail Project
3 days ago
Widman Bike Trail Phase Three Heads Toward Construction
Oct 21, 2026
Public Comment Sought on Illinois 15 and Bond Avenue Improvements
Oct 18, 2026
Madison County Board Approves Full Agenda, Including Road Projects and County Purchases
Oct 21, 2026
MCT Opens 1.5-Mile Ridge Prairie Trail in Collinsville
Sep 24, 2026