PONTOON BEACH - Thanks to financial support from Metro East Park and Recreation District (MEPRD), Madison County Transit (MCT) opened the new MCT Ridge Prairie Trail Thursday morning, adding approximately 1.5 miles to the MCT Trails system and creating a new connection between Collinsville and MCT’s expansive trail network.

The MCT Ridge Prairie Trail begins near the Collinwood subdivision at Barbara Street in Collinsville and travels northeast to connect with the MCT Goshen Trail at Formosa Junction. The new trail gives nearby residents direct bicycle and pedestrian access to MCT’s network of interconnected trails throughout Madison County.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

“The MCT Ridge Prairie Trail is a great example of what the MCT Trails system is designed to do - connect neighborhoods and communities while creating and expanding opportunities for people to walk, bike, and explore Madison County,” said MCT Managing Director SJ Morrison. “Like many of our trails, we were able to take a former railroad corridor that once connected communities and give it a new purpose.”

Building the MCT Ridge Prairie Trail required MCT to reassemble a former Pennsylvania Railroad corridor, acquiring 13 separate parcels of property along the abandoned alignment to create a continuous trail.

This corridor’s connection to its rich history is especially evident at its eastern end at Formosa Junction. The small community originally known as West Troy developed after the railroad reached the area in 1868 and was renamed Formosa in 1884. At its height, Formosa included a railroad depot and tower, post office, school, and grain elevator, while nearby dairy farms used the railroad to ship milk to St. Louis. President Theodore Roosevelt also traveled through Formosa by train on his way to the 1904 World’s Fair in St. Louis.

The railroad eventually shifted traffic away from Formosa, thanks to MCT a century later, the area will once again serve as a vital transportation crossroads. Today, Formosa Junction is where MCT’s new Ridge Prairie Trail meets the Goshen Trail.

Article continues after sponsor message

The project also included construction of an approximately 170-foot bridge over Canteen Creek and a new “Ridge Prairie” wall mural located on an abandoned railroad bridge abutment at the east end of the trail.

The project began in November 2024 and was completed in September 2026. Keller Construction served as the project contractor, with engineering services provided by Juneau Associates.

The project represents an investment of approximately $3 million. The majority of the project was funded by MEPRD, with additional funding from MCT.

The MCT Ridge Prairie Trail is part of MCT’s ongoing expansion of the MCT Trails to new destinations. From Formosa Junction, trail users can access the Goshen Trail and the broader MCT Trails network. In the future, the MCT Ridge Prairie Trail is expected to connect toward Troy through the planned Formosa East project, currently in design, which will extend the trail across U.S. Route 40 to the MCT Silver Creek Trail.

“This project would not have happened without the hard work and persistence of our Capital Projects team, the support of multiple MCT Boards, and the generosity of MERPD,” said Morrison.

MCT marked the opening September 24 with a small ribbon-cutting ceremony attended by representatives from MCT, MEPRD, the City of Collinsville, elected officials, and project partners. Following the ribbon cutting, guests were invited to walk or ride the new trail to the Ridge Prairie mural, located at Formosa Junction.

For more information about the MCT Trailsvisit MCTtrails.org or contact MCT at trails@mct.org.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

More like this:

MEPRD Opens FY27 Grant Cycle With More Than $8.4 Million for Parks and Trails
Jul 15, 2026
Mysterious Creatures debut along MCT Trails for Route 66 centennial
Aug 31, 2026
Village of Glen Carbon Awarded Nearly $300,000 Grant For Illinois-157 Shared-Use Path
Aug 18, 2026
Madison County Transit Unveils New Pedestrian Bridge Over IL-111
Jun 25, 2026
Trail Riders Rally For MEHS At Third Newt Scoot
Aug 24, 2026